14th of December - Frames have been erected. It only took a day - Saturday the 13th they erected them. Hoping the bricky will start next week .
Bricks have arrvived - Emerald bricks from Boral.
Do these look the same colour as the sample brick? I Think so.
All that reamins of the frame to be put up .
That shows the front door - nice and wide.
Oops - noggin is bit wonky
That is the door into the under section of the house. May be years to come i might excavate to another room .
View from the back yard
Shows where the alfresco will move back to.
View out over the park.
Windows in the entertainment room. They look pretty cool .
Close up on the brick .
Saturday, 13 December 2014
Sunday, 7 December 2014
Frames have been delivered
The Frames were delivered on Thursday 4th december - hopefully it will start going up this week.
Looks like there will be pleant of space under the house.
You can see the land now looks level. and the corner is well dug out.
Looks like there will be pleant of space under the house.
You can see the land now looks level. and the corner is well dug out.
Tuesday, 2 December 2014
December 2nd Drainage is in
The drainage has been excavated around the slab and backfilled in.
You can see the access from the driveway to the garage looks good and that a car will fit.
Looks as though more has been taken out of the corner.
Shot of the corner again - the dual track shows should be able to get a car in there -
Need to get a retaining wall in under the fence. I think the gap will be about 600. I expect it to be flat around the side and may need to be concreted.
Need to have retaining wall on top of the exposed sandstone - and a small retaining wall for the drop down to the slab,
View showing the angle of the driveway - looks good now and hopefully the columns are at an even base level
This is the RHS of house - all back-filled and drainage as shown
Close up photos of the Concrete fill for the bakc half of the house.
Shows the height of the underfloor area.
You can see the access from the driveway to the garage looks good and that a car will fit.
Looks as though more has been taken out of the corner.
Shot of the corner again - the dual track shows should be able to get a car in there -
Need to get a retaining wall in under the fence. I think the gap will be about 600. I expect it to be flat around the side and may need to be concreted.
Need to have retaining wall on top of the exposed sandstone - and a small retaining wall for the drop down to the slab,
View showing the angle of the driveway - looks good now and hopefully the columns are at an even base level
Close up photos of the Concrete fill for the bakc half of the house.
Shows the height of the underfloor area.