Monday, 24 November 2014

Excavations on going 15th of november.

Excavations are now progressed and the foundations around the back of the house and the framework has been put up around the slab. Noted that there is a lot of excess fill back on the site.

Also that there is still a slope back into the slab area from the front yard.

 Formwork for the slab .
Trench for foundations around the back of the house.
 Trench for the foundations.
 Another shot of the form work.
Note the water seepage from the RHS.

 Shot showing the formwork.


The corner has been excavated out a little bit.