THings completed this week
1. Gyprocking just about done
2. Garage door is in .
3. Water tank installed.
Saturday, 30 May 2015
24th May - Gyprocking starting
This week things have moved along.
We have the gyprock starting to go in .
We now have the VASIX compliance awnings in
We have the insulation in the wall.s
The noggins to mount the TVS are in ....
Th balcony balusrtrade is in
Good progress.
Thursday, 21 May 2015
17th of May. Looks like a house.
Key updates.
1. The scaffold has come down.
2. internal insulation has been put in ceiling and doors.
3. Back of the house and shot
4. Ensuite door frames are in
5. Merbau wood frames on the balcony are in.
6. Cladding painted.
1. The scaffold has come down.
2. internal insulation has been put in ceiling and doors.
3. Back of the house and shot
4. Ensuite door frames are in
5. Merbau wood frames on the balcony are in.
6. Cladding painted.
May 10th - Eaves and sliding doors
Key updates this week
1. the chippy has started to put the eaves in
2. The cladding has gone on
3. Internal electrical and plumbing has gone in
4. Internal kitchen doors have gone in.
5. Main bedroom window to be moved up
1. the chippy has started to put the eaves in
2. The cladding has gone on
3. Internal electrical and plumbing has gone in
4. Internal kitchen doors have gone in.
5. Main bedroom window to be moved up
Saturday, 2 May 2015
May 3rd - More internal Developments
Ok
So the chippy has started putting up the battens for the eaves and the plumbing and gas has been completed.
A couple of the internal doors have been mounted in the kitchen and the ensuite.
Taken a heap of internal photos for reference - I have only mounted a couple here.
The internal rough ins look to be just about complete. I need to check the mount point for the phone though.
Internal Plumbing has been suspended under the house.
Internal Door for the main bedroom ensuite
Looking from the main bathroom into at the back of the kitchen The Blue frame is the inset for the shower area.
Looking back into the living room from the main bedroom. You can see the conduits internal to the wall to be used to get cables up and down the wall.
The Sliding Doors are now in for the upstairs balcony
Looking at the ensuite plumbing.
Antoher shot from the main bedroom looking out toward the balcony.
So the chippy has started putting up the battens for the eaves and the plumbing and gas has been completed.
A couple of the internal doors have been mounted in the kitchen and the ensuite.
Taken a heap of internal photos for reference - I have only mounted a couple here.
The internal rough ins look to be just about complete. I need to check the mount point for the phone though.
Internal Plumbing has been suspended under the house.
Internal Door for the main bedroom ensuite
Looking from the main bathroom into at the back of the kitchen The Blue frame is the inset for the shower area.
Looking back into the living room from the main bedroom. You can see the conduits internal to the wall to be used to get cables up and down the wall.
The Sliding Doors are now in for the upstairs balcony
Looking at the ensuite plumbing.
The downstairs study. You can see the Phone mount is on the side wall and it should actually be on the back wall...
Antoher shot from the main bedroom looking out toward the balcony.
Friday, 1 May 2015
26th Electrical rough in done
Activities completed this week.
Not a lot of movement as we have just had the worst storm in 10 years. Torrential rain.
But at least the roof was on and for the most part the inside of the house is dry .
Main activity completed this week was that the electical rough in has been started.
Not a lot of movement as we have just had the worst storm in 10 years. Torrential rain.
But at least the roof was on and for the most part the inside of the house is dry .
Main activity completed this week was that the electical rough in has been started.