So the chippy has started putting up the battens for the eaves and the plumbing and gas has been completed.
A couple of the internal doors have been mounted in the kitchen and the ensuite.
Taken a heap of internal photos for reference - I have only mounted a couple here.
The internal rough ins look to be just about complete. I need to check the mount point for the phone though.
Internal Plumbing has been suspended under the house.
Internal Door for the main bedroom ensuite
Looking from the main bathroom into at the back of the kitchen The Blue frame is the inset for the shower area.
Looking back into the living room from the main bedroom. You can see the conduits internal to the wall to be used to get cables up and down the wall.
The Sliding Doors are now in for the upstairs balcony
Looking at the ensuite plumbing.
The downstairs study. You can see the Phone mount is on the side wall and it should actually be on the back wall...
Antoher shot from the main bedroom looking out toward the balcony.