Flooring update.

Floor was laid on the weekend, engineered prefinished blackbutt.
Getting ready for the tiles to be laid this week.
1 minor plumbing issue in the backyard/ 

Cement sheets for stabilisation have been laid as a foundation for the tiles 
Rumpus room wiht only back lights on.


 Hallway and landings


 Blackbutt laid upstairs.






Plumbing down pipe was cracked and with water pressure from the tank - we got a geyser.