Flooring update.
Floor was laid on the weekend, engineered prefinished blackbutt.
Getting ready for the tiles to be laid this week.
1 minor plumbing issue in the backyard/
Cement sheets for stabilisation have been laid as a foundation for the tiles
Rumpus room wiht only back lights on.
Hallway and landings
Blackbutt laid upstairs.
Plumbing down pipe was cracked and with water pressure from the tank - we got a geyser.